• Sign up
  • ‎What is Shvoong?‎
  • Sign In
    Sign In
    Remember my username Forgot your password?

Summaries and Short Reviews

.

Shvoong Home>Science>Engineering>Architecture>FALSE DISIGN-WORK ASSUMPTIONS AS THE MAIN REASON OF THE STRUCTURE BREAKDOWN Summary

.

FALSE DISIGN-WORK ASSUMPTIONS AS THE MAIN REASON OF THE STRUCTURE BREAKDOWN

Article Abstract by: toffi_75    

Original Authors: Wojciech Żółtowski; Stanisław Wierzbicki; Paweł Król; Jan Witkowski
The paper is dedicated
to the breakdown of the steel structure in one of the warehouse buildings in
the distribution
center, that had place on 21st of January, 2006. An area of the
described building is about 9200 m2. The main structure of the building, in the
neighborhood of the failure, comprises the set of steel truss roof purlins and
truss-girders supported on the reinforced-concrete pillars. At the beginning of
the 3rd decade of January one of the main roof truss-girders suddenly collapsed
after the destruction of one of the joints, located in the level of the upper
chord that resulted in significant bowing deflection of the roof-truss and
visible horizontal displacement of supporting column. The sudden deformations
and changes of the shape of the main roof structure caused the failure of the
other constructional elements in the nearby area, as truss purlins, bracing
system and trapezoidal roof sheeting. After some technical analyses led to find
out the reasons of the structure breakdown, many designing mistakes and
disadvantages were proved.
Published: August 21, 2007
Please Rate this Review : 1 2 3 4 5

Bookmark & share this post

.